Trunk Roads

case study
Type 2 HGV Route

This was a major reconstruction of a failed road which was achieved within programme and the clients budget, without the need to carry out lengthy and costly reconstruction.

Read More

case study
Type 2 A Class Road, Working at Night

Suffering from extensive edge failure, the original scheme required a 6 week closure of the carriageway to carry out the required excavation and re-instatement along this stretch.

Read More

Residential / Urban

case study
Residential Estate Road

In order to minimise the impact of construction traffic, the carriageway itself required structural enhancement and surfacing.

Read More

Rural

case study
Type 2 Road Haunch & Full Width

This scheme, identified by Shropshire Council was part of a larger programme of work to repair some of the county’s roads.

Read More

case study
Type 3 Rural Access Road - Forge Mill Lane

Extensive historic patch repairs were evident indicating structural issues in the carriageway which was breaking up allowing a degree of water ingress through surface cracking.

Read More

case study
Unclassified Roads

Fen Road as the name suggests is a rural single track built on soft, moving ground, resulting in cracking and deep rutting throughout.

Read More

case study
Type 2 HGV Route

This was a major reconstruction of a failed road which was achieved within programme and the clients budget, without the need to carry out lengthy and costly reconstruction.

Read More

case study
Type 2 Rural Link Road

The road was suffering from structural issues leading to extensive cracking and crazing on the surface.

Read More

case study
Type 2 A Class Road, Working at Night

Suffering from extensive edge failure, the original scheme required a 6 week closure of the carriageway to carry out the required excavation and re-instatement along this stretch.

Read More

case study
Unclassified Rural REGEN Road

The project involved the reconstruction of failing carriageways within Cambridge County Council’s rural network.

Read More

case study
Type 4 Rural Road

Showing signs of collapse and crackingwith particular issues at edges where larger vehicles appeared to have regularly overrun the extent of the existing structure.

Read More

case study
Type 4 Rural Road - Ashcott Somerset

This narrow rural road with a speed limit of 60mph had structural failures in the carriageway, some which had previously been patched.

Read More

case study
Cycle Route Improvement

The Marriott’s Way is England’s longest disused railway trail at 26 miles. Parts of the trail have been used for walking, cycling and horse riding since the 1970s.

Read More

case study
Type 3 Rural Access Road - Dadford Road

On initial visits surface issues indicated that structural failings were apparent and likely to be related to adjacent drainage and tree roots.

Read More

case study
Concrete Re-Structuring

The concrete had been overlaid historically with layers of asphalt which was worn and reflects deeper cracking and movement within the structure.

Read More

Regen Roads / Haunch

case study
Unclassified Rural REGEN Road

The project involved the reconstruction of failing carriageways within Cambridge County Council’s rural network.

Read More

case study
Type 2 Road Haunch & Full Width

This scheme, identified by Shropshire Council was part of a larger programme of work to repair some of the county’s roads.

Read More